EV & Automotive

Your comprehensive partner for EV manufacturing and charging.

SparkPower service truck beside an EV charger, ladder rack loaded with PVC conduit and tools for installation

on one timeline.

EV charging EPC

Spark delivers full turkey EPC for EV charging on your timeline.

  • Site assessment and utility coordination

    Site assessment, utility coordination, and interconnection studies sized for Level 2 through Supercharger deployments.

  • Engineering and equipment sizing studies

    Load studies, transformer sizing, switchgear and panel design, and conduit and cable design for charging sites.

  • OEM-direct procurement

    OEM-direct procurement of charging hardware and balance-of-plant equipment with all major OEMs.

  • Civil and electrical construction, self-performed

    Trenching, foundations, conduit, cable pull, transformer install, switchgear, and panels.

  • Commissioning, testing, and OEM startup

    Commissioning, testing, and OEM startup coordination delivered as part of every EPC scope.

  • Installed fleet — 100+ L2, 50+ DCFC, 20+ SC

    100+ Level 2, 50+ DC Fast Chargers, 20+ Superchargers, and 10+ MW of EV charging infrastructure delivered to date.

  • Reference deployments — OnRoute and transit

    OnRoute Network, municipal transit fleets (anonymized), and manufacturing fleet depots across Canada and the U.S.

Services behind every

EV project.

Proven Results.

Real Impact

From greenfield substations to long-term renewables O&M — explore the projects behind the numbers.

What clients say

about Spark Power.

Spark Power partners are technical buyers: utilities, asset owners, EPCs, and operations leaders. These testimonials come from active multi-year engagements.

We’ve been a client with Spark Power since 2018, and since the beginning, Spark has always been responsive, communicative, and knowledgeable. Their team talks through issues and helps us find appropriate solutions. Their responsiveness has made them a great partner in operations and maintenance for solar.

Brad Cochrane O&M Manager Alberta Renewables · Capital Power

The team’s professionalism, communication, and overall support have been excellent. They operate collaboratively and keep the project on track.

Senior Field Service Project Manager Mission Critical Client

Check it out: 2 inverters online! I nominate Andres for Spark employee of the month — please send my congratulations up the chain.

Priority Power BESS · Solar Mobile Services

Real questions,

real answers

The questions we hear most often, answered directly.
  • Yes. Turnkey EV charging EPC covering Level 2, DC Fast, and Supercharger deployments, plus 24/7 maintenance. Spark has delivered 10+ MW of EV charging infrastructure since 2017.

  • Most major OEMs including Tesla, ChargePoint, ABB, Siemens, AddEnergie.

  • Yes. Site assessment, utility coordination, engineering, procurement, civil and electrical construction, commissioning, OEM startup, and long-term maintenance — all in-house.

  • Yes. Multi-site greenfield contracting for EV OEMs (anonymized Nevada, Casa Grande AZ, Austin TX) — substations, plant power, production-line install, 480-motor LV/HV terminations, UL-certified field panel work.

  • Within 24 to 72 hours for emergency response, dispatched from 16+ regional offices across Canada and the U.S.

  • Yes. End-of-warranty inspections, QA/QC retrofit reporting, and OEM-coordinated remote monitoring and emergency dispatch are core maintenance offerings.

Let’s talk power

Fill out the form and we’ll connect you with the right Spark Power contact who can best serve all your power needs.