AltaLink Windrise Windy Flats Substation Upgrade
High-voltage substation upgrade including a 400 MVA autotransformer, protection system modernization, and full SCADA integration in Fort Macleod, AB.
Submit your request online and our team will quickly assess the situation and coordinate the right support for your site. Or call us directly for immediate assistance.
The form could not be loaded. Please try again later.
Wired 13 production lines for a leading EV manufacturer’s general assembly expansion, terminating 480 motors across LV and HV systems with a 50-technician crew.

From challenge to
A leading EV manufacturer’s general assembly expansion in Casa Grande, Arizona needed 13 production lines wired for power, controls, and automation without interrupting the rest of the facility. Spark Power put a 50-technician crew on the program, with in-house panel technicians and dedicated project teams on site so the work could adapt as the schedule and site demands shifted.