Energize on schedule with acceptance testing, transformer diagnostics, primary and secondary injection, and full LV-to-HV commissioning protocols.

Technician in cold-weather protective suit using a grounding stick to inspect an outdoor transformer at a solar site

installation & energization

The gate between

Acceptance testing is the gate between installation and energization — ATS protocols, P&C verification, and full system functional performance testing before equipment goes live.

  • Structured Verification

    Equipment is properly installed, tested, and confirmed to meet safety standards before energization.

  • NETA ATS Compliance

    Full compliance with design specifications and NETA ATS standards across scope.

  • Factory to First Energization

    FAT review, SAT, pre-energization inspections, P&C verification, functional tests.

  • Third-Party QA/QC

    Independent QA/QC and commissioning oversight common for mission-critical clients.

  • Audit-Ready Handover

    Calibration certificates and test reports ready to submit on-site, reducing the delay to startup.

What clients say

about working with Spark Power.

We’ve been very pleased with Spark’s performance on this project. The team’s professionalism, communication, and overall support have been excellent. They operate collaboratively and keep the project on track.

Senior Field Service Project Manager Mission Critical Client

Choosing Spark Testing means you’re getting a partner who treats your equipment and deadlines as their own. We show up prepared, communicate clearly, and deliver work that’s done right the first time. Whether it’s a tight outage window or a complex commissioning effort, our team brings the experience and accountability to keep your project moving and your systems reliable.

Joe Aguirre National Manager NETA, Spark Testing

Proven Results.

Real Impact

Real questions,

real answers

The questions we hear most often, answered directly.
  • Yes. Spark Testing is NETA-accredited in both Canada and the U.S., and our protocols are aligned to NETA ATS and MTS, IEEE C37 / C57 / 80 / 1547 / 1584, NFPA 70E, and NERC PRC-005.

  • Within 24 to 72 hours for emergency response, dispatched from 16+ regional offices across Canada and the U.S.

  • We have 16+ regional offices across Canada and the U.S. We are licensed across the U.S. and in 8 Canadian provinces. Our centralized supply chain enables national consistency; regional delivery enables local execution.

  • Cold commissioning verifies the system pre-energization (DC and AC integrity, controls wiring, communications, protection settings). Hot commissioning is the staged energization, performance testing, and grid synchronization phase.

  • Yes. All test instruments are calibrated to NIST-traceable standards, with calibration records available with every report.

Expertise across

every industry

Nine industries — Power Generation, Renewable Energy, Transmission & Distribution, Data Centers, Industrial Facilities, Food & Beverage, Material Handling, Mining & Aggregates, and EV & Automotive, served by the same in-house team. Backed by 16+ regional offices across Canada and the U.S., our experts offer full support across the product lifecycle.