AltaLink Windrise Windy Flats Substation Upgrade
High-voltage substation upgrade including a 400 MVA autotransformer, protection system modernization, and full SCADA integration in Fort Macleod, AB.
Submit your request online and our team will quickly assess the situation and coordinate the right support for your site. Or call us directly for immediate assistance.
The form could not be loaded. Please try again later.
Full electrical infrastructure installation for a global manufacturer’s new California production line, including 12kV substations, 5,000 LF of 480V bus duct, NETA-tested cable systems, and full re-energization delivered in six months.

From challenge to
This manufacturer’s expansion depended on robotics and tooling going in on schedule, and the electrical work had to be finished first. Midway through, it became clear the customer’s design package was only about 60% complete. Spark Power took on the rest of the design in the field and still delivered within budget.
How we
The metrics