AltaLink Windrise Windy Flats Substation Upgrade
High-voltage substation upgrade including a 400 MVA autotransformer, protection system modernization, and full SCADA integration in Fort Macleod, AB.
Submit your request online and our team will quickly assess the situation and coordinate the right support for your site. Or call us directly for immediate assistance.
The form could not be loaded. Please try again later.
Supplied and installed four dual-head EV chargers for a highway network, self-performing all civil, electrical, permitting, and commissioning work.

From challenge to
Charging stations along a highway network have to work from the day they open, because drivers depend on them. Spark Power delivered the full installation, from trenching and foundations through permitting and commissioning, so the chargers opened connected, compliant, and ready for public use.
How we
The metrics