AltaLink Windrise Windy Flats Substation Upgrade
High-voltage substation upgrade including a 400 MVA autotransformer, protection system modernization, and full SCADA integration in Fort Macleod, AB.
Submit your request online and our team will quickly assess the situation and coordinate the right support for your site. Or call us directly for immediate assistance.
The form could not be loaded. Please try again later.
Delivered turnkey electrical installation across four EV manufacturing lines in Austin, TX, with UL-certified panel work and 24/7 on-site support throughout.

From challenge to
A leading EV OEM in Austin, Texas needed four new manufacturing lines built out electrically on a schedule set by its equipment and automation partners. Spark Power took the full electrical scope, from power distribution through controls and device terminations, and worked alongside the OEM and facility teams so each line was ready when production needed it.
How we
The metrics