AltaLink Windrise Windy Flats Substation Upgrade
High-voltage substation upgrade including a 400 MVA autotransformer, protection system modernization, and full SCADA integration in Fort Macleod, AB.
Submit your request online and our team will quickly assess the situation and coordinate the right support for your site. Or call us directly for immediate assistance.
The form could not be loaded. Please try again later.
Delivered 13 integrated scopes of work across 4 buildings with a 100-technician crew, covering power distribution, high bay lighting, EV charging, and security system integration.

From challenge to
A leading EV manufacturer’s Nevada facility needed electrical work across multiple buildings delivered at the same time, on a demanding schedule. Spark Power planned and staffed the program for parallel execution, keeping every scope moving together.
How we
The metrics