Installed 102 LED fixtures across a school for Voss Lighting, completing the full scope in four days, three days ahead of the agreed one-week timeline.

Location
Texas
Sector
Industrial Facilities
Date
2024
Electricians in hard hats and high-visibility vests installing and inspecting industrial electrical panels in a facility

From challenge to

completed project

Voss Lighting needed a school lighting retrofit completed on a tight timeline. Spark Power planned the work in advance, handling installation, testing, and cleanup as one scope.

How we

solved it

  • Mapped out electrical layouts in advance to streamline navigation across buildings and classrooms
  • Followed safety protocols for relocating MC connections and re-terminating fixtures
  • Implemented an efficient electrical waste disposal process
  • Applied efficient work practices to complete the project three days ahead of schedule

The metrics

that matter

  • 102 LED fixtures installed in four days, three days ahead of schedule. Efficient planning and execution delivered the full scope well under the agreed one-week timeline.
  • Complex multi-building layouts navigated without delays. Advanced electrical layout mapping eliminated navigation inefficiencies across different buildings and classrooms.
  • All fixtures securely installed and tested. Rigorous installation and testing protocols ensured every fixture was fully operational at handover.
  • Trusted partner relationship established. Accurate quotes, scheduling responsiveness, and quality workmanship led Voss Lighting to establish Spark Power as a preferred vendor.

Related

Projects

More Spark Power projects engineered, built, commissioned, and maintained across North America — delivered to the same standard of safety, schedule, and execution certainty.

Let’s talk power

Tell us about your project, asset, or outage and we’ll connect you with the right Spark Power specialist. Our in-house team is ready to respond across Canada and the U.S.