AltaLink Windrise Windy Flats Substation Upgrade
High-voltage substation upgrade including a 400 MVA autotransformer, protection system modernization, and full SCADA integration in Fort Macleod, AB.
Submit your request online and our team will quickly assess the situation and coordinate the right support for your site. Or call us directly for immediate assistance.
The form could not be loaded. Please try again later.
Major infrastructure upgrade for GAP’s 1.78M sq. ft. Pacific Distribution Center: automation-ready power, full electrical design, and a complete lighting upgrade across two connected buildings.

From challenge to
GAP’s Pacific Distribution Center was expanding automation and robotics, and its existing electrical infrastructure wasn’t built to support them. Spark Power engineered and delivered the upgrade, giving the facility the power and lighting its next phase of automation depends on.
How we
The metrics