EPC delivery of a battery energy storage system for an oil and gas operator, from engineering design through commissioning.

From challenge to
An oil and gas operator in Sarnia, Ontario wanted on-site battery storage to support grid reliability and energy management. Spark Power took the project through the full EPC lifecycle, running regulatory and utility approvals in parallel with engineering and construction so the project didn’t stall waiting on paperwork.