AltaLink Windrise Windy Flats Substation Upgrade
High-voltage substation upgrade including a 400 MVA autotransformer, protection system modernization, and full SCADA integration in Fort Macleod, AB.
Submit your request online and our team will quickly assess the situation and coordinate the right support for your site. Or call us directly for immediate assistance.
The form could not be loaded. Please try again later.
Installed a four-level conveyor system for a Tier 1 automotive facility in Ohio, integrating photoeyes, VFDs, laser sensors, scan cameras, and a full safety system.

From challenge to
When a production conveyor goes down, the line it feeds stops with it. Spark Power delivered the electrical, automation, and safety scope for the new system and handed over a conveyor the facility could run from day one.
How we
The metrics