Canada BW

Project

Installed emergency lighting, sump pump power, and metering for Canada BW following a negative experience with their previous contractor. Completed efficiently, ahead of schedule, and with clear communication throughout.

Sector
Industrial Facilities
Date
2024
Electricians in hard hats and high-visibility vests working on indoor switchgear and control panels in a utility facility

From challenge to

completed project

Canada BW’s priority was a contractor who would be responsive and close out every item. Spark Power worked alongside the general contractor to keep the project on track in an occupied building.

How we

solved it

  • Established effective communication channels with the general contractor
  • Implemented a streamlined electrical waste disposal process
  • Promptly followed up on all outstanding items
  • Responded quickly to any issues or requests throughout the project

The metrics

that matter

  • Project completed correctly the first time. Reliable, safe electrical installation delivered without the rework issues experienced with the previous contractor.
  • Completed ahead of schedule with minimal tenant disruption. Responsive execution minimized downtime and disruption across Canada BW’s occupied building.
  • Transformer updates and building subdivision delivered. Transformers upgraded and building divided into three separate units with clear, client-facing communication throughout.
  • Strong, ongoing client relationship established. Successful execution strengthened the partnership and led to continued electrical work across the property.

Related

Projects

More Spark Power projects engineered, built, commissioned, and maintained across North America — delivered to the same standard of safety, schedule, and execution certainty.

Let’s talk power

Tell us about your project, asset, or outage and we’ll connect you with the right Spark Power specialist. Our in-house team is ready to respond across Canada and the U.S.