AltaLink Windrise Windy Flats Substation Upgrade
High-voltage substation upgrade including a 400 MVA autotransformer, protection system modernization, and full SCADA integration in Fort Macleod, AB.
Submit your request online and our team will quickly assess the situation and coordinate the right support for your site. Or call us directly for immediate assistance.
The form could not be loaded. Please try again later.
Completed a full motor circuit inspection and replacement program at an aggregates facility, bringing all circuits to NEC/IEC standards with updated documentation.

From challenge to
Defective or undersized motor circuits are an electrical risk, a reliability problem, and, at an aggregates facility, a production problem too. Spark Power ran a facility-wide inspection and replacement program to find and fix every weak circuit. The site now has code-compliant motor infrastructure and documentation its maintenance team can work from.
How we
The metrics