AltaLink Windrise Windy Flats Substation Upgrade
High-voltage substation upgrade including a 400 MVA autotransformer, protection system modernization, and full SCADA integration in Fort Macleod, AB.
Submit your request online and our team will quickly assess the situation and coordinate the right support for your site. Or call us directly for immediate assistance.
The form could not be loaded. Please try again later.
Installed and commissioned Motor Control Center panels for an aggregates facility, with full interlock and functional verification before handover.

From challenge to
MCC installations leave no margin for error at energization, because every protection and control function has to be right before equipment goes live. Spark Power installed and commissioned the facility’s new MCC lineup and verified the system end to end before handover.