Turnkey EPC to expand MARA’s operating 138/13.8 kV substation in Hannibal, Ohio from roughly 100 MW to 200 MW with N+1 redundancy, delivered through progressive design-build.

From challenge to
MARA needed to double capacity at its operating Hannibal, Ohio site as it moved into AI data centers through a joint venture with Starwood Capital Group. Spark Power had supported the site’s existing data center operation for three years across engineering, construction, commissioning, and substation upgrades.
How we
The metrics