AltaLink Windrise Windy Flats Substation Upgrade
High-voltage substation upgrade including a 400 MVA autotransformer, protection system modernization, and full SCADA integration in Fort Macleod, AB.
Submit your request online and our team will quickly assess the situation and coordinate the right support for your site. Or call us directly for immediate assistance.
The form could not be loaded. Please try again later.
Installed and terminated 350 fiber ends, completing OTDR and power loss testing on every fiber per TIA/EIA-568 and ISO/IEC 11801 standards.

From challenge to
Plant communications at an aggregates facility are only as reliable as the fiber behind them. Spark Power installed and terminated the site’s new fiber network and verified every strand before handover, so the operator received documented, tested performance.
How we
The metrics