AltaLink Windrise Windy Flats Substation Upgrade
High-voltage substation upgrade including a 400 MVA autotransformer, protection system modernization, and full SCADA integration in Fort Macleod, AB.
Submit your request online and our team will quickly assess the situation and coordinate the right support for your site. Or call us directly for immediate assistance.
The form could not be loaded. Please try again later.
Delivered electrical engineering and design services for Draeger’s facility, safely demolishing the existing system and installing new power distribution to support new training equipment on time and to spec.

From challenge to
Draeger was bringing new equipment into its facility and needed a new power distribution system to support it. Spark Power designed the replacement system and delivered it on a tight deadline.
How we
The metrics