AltaLink Windrise Windy Flats Substation Upgrade
High-voltage substation upgrade including a 400 MVA autotransformer, protection system modernization, and full SCADA integration in Fort Macleod, AB.
Submit your request online and our team will quickly assess the situation and coordinate the right support for your site. Or call us directly for immediate assistance.
The form could not be loaded. Please try again later.
Full turnkey electrical scope for a chemical manufacturing facility. Spark scaled from 30 to 80+ personnel to deliver substation, distribution, process wiring, and commissioning on an aggressive timeline.

From challenge to
A chemical manufacturing facility awarded Spark Power its electrical scope on the strength of a previous engagement. When the scope grew significantly mid-project, Spark scaled its crew to match and carried the work through commissioning and turnover.
How we
The metrics