AltaLink Windrise Windy Flats Substation Upgrade
High-voltage substation upgrade including a 400 MVA autotransformer, protection system modernization, and full SCADA integration in Fort Macleod, AB.
Submit your request online and our team will quickly assess the situation and coordinate the right support for your site. Or call us directly for immediate assistance.
The form could not be loaded. Please try again later.
Wired a 400,000 sq. ft. automotive distribution facility in 8 weeks with zero delays. That performance extended the work into a year-long engagement.

From challenge to
A 400,000 sq. ft. automotive distribution facility in Michigan needed its conveyor system wired on a fast-track schedule. Spark Power hit every Phase 1 milestone, and that performance turned a short job into a longer-term engagement covering the facility’s automation, robotics, and perimeter systems.
How we
The metrics