AltaLink Windrise Windy Flats Substation Upgrade
High-voltage substation upgrade including a 400 MVA autotransformer, protection system modernization, and full SCADA integration in Fort Macleod, AB.
Submit your request online and our team will quickly assess the situation and coordinate the right support for your site. Or call us directly for immediate assistance.
The form could not be loaded. Please try again later.
Delivered a complete 138kV substation expansion for bitcoin mining in Ohio, installing a 115 MVA transformer and completing NETA-compliant testing and commissioning.

From challenge to
A bitcoin mining operation in Ohio needed more capacity from its substation to support growth without putting the existing station at risk. Spark Power took the expansion from engineering design through construction and commissioning, so the new capacity was integrated into the station and verified before it went into service.
How we
The metrics