Delivered turnkey EPC for 10 MW / 20 MWh BESS infrastructure at mining facilities in Belleville and Sudbury, Ontario, including 44 kV and 69 kV substation design and installation.

From challenge to
Two active mining operations in Belleville and Sudbury, Ontario needed battery energy storage connected to the utility grid, delivered at the same time without disrupting production. Spark Power took both sites under one EPC scope, handling engineering, construction, and safety management with a single project team across both locations.