AltaLink Windrise Windy Flats Substation Upgrade
High-voltage substation upgrade including a 400 MVA autotransformer, protection system modernization, and full SCADA integration in Fort Macleod, AB.
Submit your request online and our team will quickly assess the situation and coordinate the right support for your site. Or call us directly for immediate assistance.
The form could not be loaded. Please try again later.
Replaced 76 DC motors with high-efficiency AC motors and VFD technology and delivered a new redundant Rockwell control system for the Rogers Centre’s retractable roof, cutting opening and closing time in half.

From challenge to
The Rogers Centre, home to the Toronto Blue Jays and the world’s first fully retractable stadium roof, operated on the same aging control system since 1989. Reliability had steadily declined: the roof experienced prolonged and inconsistent opening and closing times, panels periodically slowed or stopped, and a stand-alone manual system made root cause troubleshooting difficult.
Spark Power was selected to lead the modernization after presenting project plans that demonstrated they had fully understood the real operational needs.
How we
The metrics