AltaLink Windrise Windy Flats Substation Upgrade
High-voltage substation upgrade including a 400 MVA autotransformer, protection system modernization, and full SCADA integration in Fort Macleod, AB.
Submit your request online and our team will quickly assess the situation and coordinate the right support for your site. Or call us directly for immediate assistance.
The form could not be loaded. Please try again later.
Designed, fabricated, and pre-commissioned five modular control buildings for a company’s renewable energy portfolio.

From challenge to
The company needed control buildings for several renewable energy sites and wanted as much of the work as possible finished before the units reached site. Spark Power designed and built the E-Houses in its own shop, so each one arrived ready to install.
How we
The metrics