Winoa Transformer Failure
Emergency mobilization to isolate, test, repair, and re-energize an arc furnace transformer for Winoa, restoring power with minimal production downtime.
Submit your request online and our team will quickly assess the situation and coordinate the right support for your site. Or call us directly for immediate assistance.
The form could not be loaded. Please try again later.
Restored overhead distribution systems across Connecticut, New York, and New Jersey following back-to-back nor’easters. Delivered safely, on time, and on budget at $550K.

From challenge to
In March 2018, two powerful storms hit the Northeast in quick succession, leaving almost 3 million people without power at the peak. Utilities needed extra crews who could mobilize fast and stay for a sustained response, and Spark Power crews stayed on the restoration through both storms.
How we
The metrics