AltaLink Windrise Windy Flats Substation Upgrade
High-voltage substation upgrade including a 400 MVA autotransformer, protection system modernization, and full SCADA integration in Fort Macleod, AB.
Submit your request online and our team will quickly assess the situation and coordinate the right support for your site. Or call us directly for immediate assistance.
The form could not be loaded. Please try again later.
Designed and constructed a new 138kV substation and 15kV MV distribution system supporting 40,500 crypto mining units in Rockdale, TX, delivered as a full EPC engagement.

From challenge to
A large-scale crypto mining operation in Rockdale, Texas needed a power backbone that could carry its full electrical load from the day it went live. Spark Power delivered the work as a full EPC engagement, building new high-voltage infrastructure and rebuilding the site’s existing substations. Everything was tested and commissioned before energization.
How we
The metrics