AltaLink Windrise Windy Flats Substation Upgrade
High-voltage substation upgrade including a 400 MVA autotransformer, protection system modernization, and full SCADA integration in Fort Macleod, AB.
Submit your request online and our team will quickly assess the situation and coordinate the right support for your site. Or call us directly for immediate assistance.
The form could not be loaded. Please try again later.
Converted mobile electrical trailer into a durable sea-container enclosure with new 600V switchgear, capacitor bank, ESA permitting, and full commissioning.

From challenge to
An aggregates operation needed its site power moved into a permanent, durable enclosure. Spark Power rebuilt and upgraded the electrical system in its new home, handing over a system ready to operate.
How we
The metrics